Request a Crane Quote in Nigeria

Planning a new overhead, gantry or jib crane for a site in Lagos, Port Harcourt, Abuja or anywhere else in Nigeria? Phone or email our sales team using the details below, or complete the quotation form. Our engineers at the Wimac factory in Konya, Turkey will size the crane for your application and send back a fully specified offer.

Sales Contact for Nigeria

Want to talk to someone today about a crane for your Nigerian site? Use the details below, or send the quotation form and we will get back to you.

Crane Quote Request for Nigeria

Pick the type of equipment you need, then enter the dimensions you know. Expect a detailed quotation from our team within 24-48 hours. Not sure what affects the figure? Read our guide to crane price in Nigeria first.

Overhead Crane Details

Overhead bridge crane drawing marking the span, lifting height and runway rail length to measure

Overhead Crane — single girder, double girder and suspended bridge designs

*
*
Capacity: The heaviest load the crane must be able to lift safely, including any attachment hung from the hook.
*
Span (S): The horizontal distance between the centres of the two runway rails — in other words, how wide the crane has to reach from one side to the other.
*
Rail Length: The full length of the runway the crane travels along, i.e. how far it needs to move forwards and backwards.
*
Lifting Height (H): The highest point, measured from the floor, to which the hook must raise the load.
Floor to Bridge (HB): Measured from the floor up to the underside of the crane bridge.
Floor to Rail (HR): How high above the floor the runway rails (the crane's mounting level) are, or will be, installed.
Floor to Ceiling (HM): The clear height from the floor up to the roof or ceiling.

Gantry Crane Details

Gantry crane drawing marking the span, left and right cantilevers and lifting height to measure

Gantry Crane — full gantry, semi gantry and L-type layouts

*
*
Capacity: The heaviest load the crane must be able to lift safely, including any attachment hung from the hook.
*
Span (S): The horizontal distance between the centres of the two runway rails — in other words, how wide the crane has to reach from one side to the other.
*
Rail Length: The full length of the runway the crane travels along, i.e. how far it needs to move forwards and backwards.
*
Lifting Height (H): The highest point, measured from the floor, to which the hook must raise the load.
Floor to Bridge (HB): Measured from the floor up to the underside of the crane bridge.
Right-Hand Cantilever (S1): How far the girder overhangs past the right-hand rail, letting the hook work outside the runway on that side.
Left-Hand Cantilever (S2): How far the girder overhangs past the left-hand rail, letting the hook work outside the runway on that side.

Jib Crane Details

Jib crane drawing marking the arm length, column height and slewing angle to specify

Jib Crane — wall-mounted and free-standing versions

*
Capacity: The heaviest load the crane must be able to lift safely, including any attachment hung from the hook.
*
*
*
Lifting Height (H): The highest point, measured from the floor, to which the hook must raise the load.
*
Slewing Angle: How far, in degrees, the jib arm has to swing around its column or wall bracket.

Hoist / Lifting Unit Details

Wire rope hoist lifting unit drawing on a double girder bridge, marking the dimensions to measure

Lifting Unit — for double girder and monorail installations

*
*
Capacity: The heaviest load the hoist must be able to lift safely.
*
Span (S): The horizontal distance the crane bridge covers between its two runway rails.
*
*
Lifting Height (H): The highest point, measured from the floor, to which the hook must raise the load.
Floor to Bridge (HB): Measured from the floor up to the underside of the crane bridge.
Floor to Rail (HR): How high above the floor the runway rails (the crane's mounting level) are, or will be, installed.
Floor to Roof (HM): The clear height from the floor up to the roof or ceiling.

Your Details

*
*
*

Crane Quotes for Nigeria: How It Works

Whether the crane is for a factory in Lagos, a yard in Port Harcourt or a plant in Kano, the quotation process is the same. Here is what to expect.

How quickly will I receive a crane quotation?

Once we have your specifications, our team aims to send a detailed, fully specified quotation within 24-48 hours.

What information should I include in my request?

Choose the product type, then give the capacity, span, lifting height and rail length, plus building heights (floor to rail, floor to bridge and floor to roof) where you know them. Add a note on what you lift and how often the crane will work.

I don't know all the dimensions yet. Can I still ask for a quote?

Yes. Send what you have and describe the building or yard in the notes field. Our engineers will come back to you with the questions needed to complete the specification.

Where are the cranes manufactured?

All Wimac cranes are designed and built at our headquarters and factory in Konya, Turkey, then supplied, installed and serviced for customers in Nigeria.